- You are here:
- Home
- Departments
- Engineering & Public Works
- City Projects
City Projects
Active City Projects
-
100th Street Interchange
Proposed is the construction of an interchange at 100th Street and Interstate 35/80. In 2017 the ramps would be graded and in 2018 the ramps would be paved.
Link to page -
Waterford Road - 156th to 170th
This project would provide for the reconstruction of Waterford Road from 156th Street west to 170th Street as a four-lane roadway with left turn lanes including grading, storm sewer and a new bridge.
Link to page -
75th Street & Douglas Avenue Intersection
This project includes left turn lanes and a new traffic signal at the intersection of 75th Street and Douglas Avenue to increase capacity of the intersection and reduce travel time through the intersection.
Link to page
-
86th Street Preservation Project
This project would provide for the patching and overlay of 86th Street from Aurora Avenue to the north corporate limits.
Link to page -
Douglas Avenue Gateway Enhancements
This project would provide for the Douglas Avenue Beautification at Interstate 35/80. The beautification includes installation of 4 gateway signs, landscape beds, plantings, irrigation, PCC edger, concrete work to address vehicle off-tracking, and seeding. It is anticipated that this project will be completed by November 2018.
Link to page -
Meredith Drive - 156th Street to 170th Street
The construction of a four-lane roadway for Meredith Drive beginning at 156th Street and extending west to 170th Street.
Link to page
Upcoming City Projects
- 86th Street Preservation Project
- 72nd Street Reconstruction Project
- 104th Street Reconstruction – Hickman Road to Douglas Avenue